Cameron Measurement Systems

When it was decided that productivity for this manufacturing plant would be improved by controlling the interior climate, Air-Tro was hired for its design-build skills. We provided engineering and construction management, HVAC contracting, and retained the insulation, electrical, concrete, and gas fuel line contractors, all while coordinating all of their efforts.

The result was 140 tons of cooling installed and running within three months of project start. All work was done while the plant remained open and in production, which minimized the inconvenience to Cameron personnel.

Air Handler Services in Pasadena, CA

Pasadena, CA AC repair

Pasadena, CA Heater repair

Pasadena, CA AC fix

Pasadena, CA heating & Cooling replacement

Pasadena, CA Furnace installation

Stop Motion Video of a Commercial HVAC Installation

 

View our full list of projects